Now that my KAL knitting is complete and one nephew's Christmas, I am moving along in the list. On the needles right now:
Knitting this up for a shop sample
Main yarn is Lorna's Laces Shepherd Worsted
US Needle: 11
Yarn: Fourth of July from Briar Rose
US Needle: 6
This is the first pieced sweater I've made in ages!
My October goals include finishing up these two projects and the following:
1. Aidan's Christmas knitting/crochet. Remember, I got specific instructions from the little man regarding Spiderman needs. I think I've figured out some solutions...
2. Crochet Every Way Wrap: Tonia, Nancy, and I are going to make this together. I have the yarn and swatch all ready. Start night is 10/17 at T's house!
If I can get all of these things done in October, I will be in GREAT shape for the holidays. That would only leave one sweater to make for Patrick. I could then make that sweater in November and cast on some items for myself. I'm a little shy about making more sweaters for myself right now because my size is changing, which is a good thing. There is a hat that I might have to toss into October for myself...
1. Aidan's Christmas knitting/crochet. Remember, I got specific instructions from the little man regarding Spiderman needs. I think I've figured out some solutions...
2. Crochet Every Way Wrap: Tonia, Nancy, and I are going to make this together. I have the yarn and swatch all ready. Start night is 10/17 at T's house!
If I can get all of these things done in October, I will be in GREAT shape for the holidays. That would only leave one sweater to make for Patrick. I could then make that sweater in November and cast on some items for myself. I'm a little shy about making more sweaters for myself right now because my size is changing, which is a good thing. There is a hat that I might have to toss into October for myself...
No comments:
Post a Comment